Offshore Wind Power Installation and O&M Scenarios

图片20

– Adapting to the global surge in offshore wind power demand, completing the full-process operations of “wind turbine installation-O&M and maintenance”, and mainly meeting the operational requirements of large lifting capacity, precise alignment, and flexible response.

1. Wind Turbine Installation Phase

– Safely hoisting 100-500 ton-level wind turbine towers, blades, and generators, offsetting the impact of offshore wind and waves, and ensuring installation accuracy and stability.

Products and Support We Provide:

Specialized Offshore Wind Crane: Including fixed type (main hook lifting capacity of 600-1200 tons, auxiliary hook for precise alignment) , suitable for different installation scenarios.

Tension Winch: Controls the positioning cables of the installation vessel, effectively offsetting the sway of the vessel caused by wind and waves, and providing a stable environment for crane operations.

2. O&M (Operation and Maintenance) Phase

– Quickly replacing wind turbine components such as gearboxes and blades, safely transporting O&M personnel and tools, and improving maintenance efficiency.

Products and Support We Provide:

Service Platform Crane: A small telescopic boom crane with a lifting capacity of 10-20 tons, installed on O&M vessels for efficient hoisting of maintenance tools and spare parts.

Access Ladder Winch: Safely retracts and releases the access ladder connected to the wind turbine, ensuring the safety of O&M personnel when ascending and descending the turbine.

Emergency Rescue Winch: Equipped with a high-speed hoisting system (lifting speed ≥ 1.5m/s) to quickly recover lifeboats or rescue personnel in emergency situations.