(1) General rules: Operate with a valid certificate; check the equipment for faults before operation; wear protective gear; do not leave the operation console without permission.
(2) Anchoring operation: Release the anchor chain slowly during anchoring to prevent overload breakage; test the brake before weighing anchor; stop and inspect if jamming occurs; secure the anchor head after weighing anchor.
(3) Mooring operation: Control uniform cable tension when berthing; adjust tension in a timely manner during wind and waves; release tension before winding the cable when leaving the port; clean impurities to prevent corrosion.
(4) Special scenarios: Increase inspection frequency in severe weather; remove ice from cables before operation if they are iced; clean the equipment and apply anti-corrosion grease after operation in salt spray environments.